October 28, 2021
Skeedeen Phase 7-3
Thursday
With the existing brightwork sanded and cleaned, my next step was to mask off around the wood as needed, on the windshield, helm area, engine box, around the handrails, forward hatch, and anchor platform.
After final preparations and tacking off, I applied a coat of varnish to all these areas on the boat, as well as to the loose hatches and trim pieces down in the shop.
Total time billed on this job today: 5.25 hours
0600 Weather Observation: 43°, clear, windy. Forecast for the day: Partly sunny, 53°