Boat:  Equinox, 1986 Contessa 26 (J.J. Taylor)


Project Schedule: 
Project Complete

Scope of Project:  Hull refinish; assessment of deck structural condition and repairs/refinishing as necessary; electrical system; diesel repower; plumbing and through hull replacement as needed; refinish interior and exterior woodwork; provide greater access to bilge and remove concrete located therein; rigging assessment and replacement as required; reconfigure cockpit sole engine access for quick removal; more.   


Daily Project Diary:
 Click here to begin.

Or, click on a date below to go directly to any point in the project.
11/2/08 | 11/26/08 | 12/1/08 | 12/4/08 | 12/5/08 | 12/8/08 | 12/9/08 | 12/10/08 | 12/11/08
12/12/08 | 12/15/08 | 12/17/08 | 12/18/08 | 12/19/08 | 12/22/08 | 12/23/08 | 12/29/08

12/30/08 | 12/31/08 | 1/2/09 | 1/5/09 | 1/6/09 | 1/7/09 | 1/8/09 | 1/9/09 | 1/12/09 | 1/13/09
1/14/09 | 1/15/09 | 1/16/09 | 1/19/09 | 1/20/09  | 1/21/09 | 1/22/09 | 1/23/09 | 1/26/09
1/27/09 | 1/28/09 | 1/29/09 | 1/30/09 | 2/2/09 | 2/3/09 | 2/4/09 | 2/5/09 | 2/6/09  | 2/9/09
2/10/09 | 2/11/09 | 2/12/09 | 2/13/09 | 2/16/09 | 2/17/09 | 2/18/09 | 2/19/09 | 2/20/09
2/21/09 | 2/23/09 | 2/24/09 | 2/25/09 | 2/26/09 | 2/27/09 | 3/2/09 | 3/3/09 | 3/4/09 | 3/5/09
3/6/09 | 3/9/09 | 3/10/09 | 3/11/09 | 3/12/09 | 3/13/09 | 3/23/09 | 3/24/09 | 3/25/09 | 3/26/09
3/27/09 | 3/30/09 | 3/31/09 | 4/1/09 | 4/2/09 | 4/3/09 | 4/6/09 | 4/7/09 | 4/8/09 | 4/9/09 | 4/10/09
4/13/09 | 4/14/09 | 4/16/09 | 4/18/09

 

Nearing the End of the Project:  April 4, 2009


Equinox shortly after arrival at the shop in November, 2008