Matthilda 1

Boat:

Matthilda, a 1962 Pearson Electra 22' Sloop

Schedule:

Project Schedule:  Winter 2026-2027

Project Scope:  Deck recore and refinishing; Rebed hardware; (Hopefully) Hull refinishing; Interior work; minor rigging and electrical work; More or Less TBD

Begin Daily Project Logs

September 28, 2026

Matthilda 1

Monday

Shortly after her owner delivered Matthilda to the shop, I moved the boat indoors and positioned her where I wanted her for the winter.

Then, with the trailer parked, I spent several minutes leveling the boat from side to side, making minor adjustments as needed to the trailer jackstands till the boat was close to level according to my 6′ level across the bow, and across the cockpit and aft end of the coachroof.

I also adjusted the boat fore and aft, using the trailer jack, so that the waterline (defined for this purpose as the top edge of the bottom paint) was essentially the same distance above the floor at the stem and stern.  Later in the project, I planned to check and fine-tune both level measurements as needed, but for now all was close enough.

Next, I set up staging around the boat to give me a comfortable work platform for deck work, which would be the main focus of the project and the first thing I planned to start.

Total time billed on this job today: 2 hours