January 10, 2025
Danusia Phase 2-7
Friday
With the rest of the brightwork stripped and sanded, I turned to a few loose parts I’d removed: the pedestal table and companionway swashboards. These also required stripping and sanding so they could be refinished.
After removing hardware, I stripped and sanded the wood clean.
Total time billed on this job today: 1.75 hours