Matthilda 10

From time to time, as progress and editing time (and inclination) dictate, I’ll try to post some videos as the project moves forward.

In video No. 1, I got the boat set up in the shop and removed all the deck hardware in preparation for the deck repair project.  Enjoy!

If you enjoy these videos, please subscribe to my channel!

Matthilda 9

Before continuing work on the sidedecks, I decided to install the new top laminate for the coachroof.  To that end, I began by vacuuming and solvent-washing the area to clean it properly after yesterday’s sanding work.  I made a pattern of the inside of the cored area (the cutout), and also of the overall shape of the space, to the edges of the adjacent ground/prepared deck surfaces.  The innermost line is the cutout above the core; the outer line is the overall (maximum) shape.

Then, I filled the small gaps here and there between core pieces with a thickened epoxy mixture.  I also filled a small depression just off centerline to starboard to fair this in.

While I let that material setup for a while, I cut the three layers of 1708 fiberglass I planned for the space:  One to fit within the cutout and bring the top level of the core up closely to the adjacent deck edge; and two overlapping layers to extend beyond and out onto the adjacent decks.  Because the overall dimensions were larger than the standard width of a roll of cloth (39″), each layer required more than one piece to fit, so I ensured that I widely staggered the seams between layers.

Then, working steadily, I installed all three layers in epoxy resin, leaving the new laminate to cure overnight.

 

Matthilda 8

I removed the weights and plastic atop the new coachroof core, and removed the bracing from belowdecks.

There’d be some additional work on this newly-cored area soon, including filling the small gaps between sections of core and sanding the resin coating the surface lightly to remove any ridges left from the plastic and weights, but before I got to that, I returned to work on the sidedecks and foredeck, cleaning out any final bits of core from beneath the edges.  On the foredeck, I removed the old plywood centerline stiffener/reinforcement, and slightly expanded the cut near the stem to expose more core for easier removal.

Next, I sanded the exposed inner skins of the sidedecks and foredeck to remove any residue left from the old core, and to clean up and prepare the fiberglass for new adhesive.  At the same time, I lightly sanded the top of the fresh coachroof core to smooth any small resin ridges left from installation.

With those sanding cores done, I dove into the dirtiest part of this project and ground off the gelcoat and formed a tapered area on the decks adjacent to all the areas being recored, including the coachroof, sidedecks, and foredeck.  Afterwards, I cleaned up the boat and shop to clear the air and get rid of the substantial sanding dust, as well as core detritus from the floor and the past couple days’ work.  I also cleaned up the interior a bit to remove the worse of the mess from the coring and hardware removal efforts so far.

With all the major prep work complete, next time I could begin to lay out the new core for the sidedecks and foredeck.

Matthilda 7

I spent 30 minutes or so on a final round of cleanup at the overhanging perimeters of the coachroof to ensure that I’d cleaned out all the old core as possible.

In this instance, there was room beneath the reamed-out edges to slip new core; sometimes there is, sometimes there isn’t, depending on the nature of the original cored structure and where the cutlines ended up.  But here, the outboard edges, and around the companionway, had enough room so I could fit narrow pieces of core that slipped within.  I marked the boundary of all these narrow pieces around the area for later reference.

Next, I prepared simple paper patterns of the remaining field areas that I used to transfer the shape to new 3/8″ balsa core.  These were not fancy patterns, but enough to get the core shaped the way it needed.  I intentionally cut inside the lines to allow a bit of wiggle room when installing the core, as tolerances that were too tight could run into trouble during installation.  Any small gaps would be filled with a thickened epoxy mixture during installation.

With the core all patterned and cut, I removed it all and moved on to installation.  This was a hectic flurry of activity for the next hour and a half, with nonstop work required to stay ahead of the epoxy and get the core wetted out on both sides, fill all the core edges and epoxy-filled gaps, and the field core in place and set before the epoxy started to cure.  I weighted the core in place with sandbags and a few other weights to ensure it pressed well into the curvature of the coachroof and adhesive thereunto.

The bracing belowdecks did a good job maintaining the shape of the overhead.

I spent the remainder of the day uncoring the sidedecks and foredeck, starting on the starboard side and working my way around.  This project went about as well as possible, as I found (not surprisingly) that the top skins were completely debonded from the core beneath, and the core itself was debonded from the inner skin.  The 2″ wide balsa planks used to core this boat were largely wet or at least damp, except for a large portion of the port foredeck, where the planks were dry, but still deteriorated, similar to the way dry rot affects wood.  Most likely, the dynamics on the boat and people walking on the flexible deck worked together to help turn even the sound-ish core to mush.

It was quick to remove the planks and scrape off most of the excess from the exposed deck surfaces, and I used various tools to ream out the openings beneath the overhanging flanges all around, getting the bulk of the old core and debris out, though I planned another round in the morning to finalize the prep work.

For the moment, I left the longitudinal plywood reinforcement in the foredeck in place pending further inspection.  It didn’t immediately appear to want to pop out like the balsa, and appeared generally sound, but I’d instigate it more next time and determine its fate.

With the main decks uncored and mostly cleaned up, I called it a day.

Matthilda 6

A quick inspection of the rubrail and some thoughts about its removal and replacement.

Matthilda 5

With only a short day, I decided to keep my focus on the coachroof, since I’d lose my work access to the coachroof  if I started to uncore (decore?) the sidedecks, which I needed to get to the coachroof area.  So I used a variety of tools to ream out any bits of old core till stuck in the overhanging edges around the perimeter of the space:  electric multitool, seam reamer, chisels, and more.  The vibrating multi tool worked well to loosen final bits that were hanging on for dear life, and the manual tools–and compressed air–worked well to get all the material out afterwards.

To continue working on the coachroof, which, while it retained its designed shape was flimsy and easily distorted now that the core was removed, needed reinforcement/support it from beneath so I could finish the surface prep and, later, install the new core.  To this end, I cut several 3″ wide strips of plywood to spread the support over wider areas, and, after protecting the overhead with strips of tape, hot-glued the plywood in place:  two roughly evenly-spaced transverse pieces spanning the cabin width between the companionway hatch and the forward edge of the doghouse; and two shorter, longitudinal pieces at the aft ends on either side of the hatch.  Then, I measured and cut to length several vertical supports to hold everything in place, using more hot glue to help keep the bracing where it should be.  I used the minimum bracing I could that would do the job I needed it to do.

This stiffened the coachroof appreciably, and made it possible for me to sand the exposed inner skin with 40 grit paper on a 90 degree random orbital sander, and some additional hand work with the coarse paper in the gaps along the edges.  This step cleaned off most of the remaining core bits and prepared the surfaces for new material.  After cleanup, I noticed a few tenacious strands here and there remaining from the old core, and I’d take care of those, along with patterning and cutting and installing new core, next time.

Matthilda 4

First thing, I attacked the backstay chainplate, and without too much trouble and in short order I managed to remove the tight bolts and free the chainplate.    Access was the real problem–finding a sight angle that also allowed me to use a hammer to hit the bolt ends–but I found that coming at it from the cockpit side helped, and before long the job was complete.

In the cockpit, I finished up the un-installation of the final few bits of hardware, including the small round deck plate and scupper screens, and removed the foamy/cushy faux teak stuff that someone had put on the cockpit sole.  Then, I removed the remaining companionway trim.

To remove the mast step, I chiseled out some epoxy over the screw heads securing it in place, and then removed the screws.  These screws appeared to be threaded into the aluminum support plate belowdecks, not just throughbolted through it.  I used a chisel to carefully break the seal between the mast step and the deck and release it without damage, other than one area where a bit of the plywood of the step remained on deck, held tightly by whatever sealant was used.

Next, I inspected the decks and coachroof to determine the extent of core damage for repair.  On this boat, the sidedecks aft of the cabin, the aft deck, and the cockpit seats and sole, were solid fiberglass (the cockpit seats and sole featured glassed-in stiffeners belowdecks), so no repairs needed there, although I planned to add core and new top laminate on top of the existing cockpit sole to stiffen what was a highly flexible and weak-feeling structure now.

The small forward, lower section of the coachroof turned out to be structurally sound, which I determined through sounding, a few test holes drilled into the structure, and existing holes around the mast step, where I could observe the core.

The upper section of the coachroof was trashed, and this had been obvious all along.  Still, I drilled a few test holes to confirm the sounding and other observations, then marked out some cutlines along the perimeter since the core tapered off around the companionway opening and at the other edges of the space.  I left 3″ of material in all areas to stay away from the tapering core, and leave ample room for bonding the new top laminate in place.

Meanwhile, I sounded and inspected the rest of the sidedecks and foredeck in the same way, though I appear to have forgotten to take any photos of test holes.  But these areas were clearly compromised, which I’d found while working around the decks to remove hardware and such.  The issue with these deck areas seemed to be more one of debonding, where the bond between the top skin and core fails for one reason or another.  These photos show some of the random test holes I drilled in the sidedecks to inspect the core.  They show core in generally and apparently sound-ish condition, but the flexing of the deck was clear and possible even with finger pressure around the holes.

With the inspection complete, and knowing what the decks needed from me, I turned to the coachroof first, and used a circular saw and vibrating multi tool as needed to cut out the top skin along my layout lines.  The top laminate released instantly and easily, revealing the longitudinal balsa wood planks that are notorious in Pearson circles and were used in some very early Pearsons from the 1950s and early 1960s, before scored end-grain balsa core became a common installation.

With the skin removed, I scraped out as much of the sodden balsa as possible, reaming it from beneath the remaining edges and getting as much cleaned out as I could now, though there’d be another round of scraping and cleanout to come later.  This was not difficult, as the longitudinal planks were rotten and soaked and not well-adhered to the inner skins.  I spent most of the removal time scraping the core out from the outer perimeter, where core remained between the skins.  I used a variety of tools for this, but mainly relied on my hook-shaped seam reaming tool that works well for this task.

With the coachroof de-cored, it brought me to a good stopping point for the day.  Next, I planned to attack the sidedecks and foredeck in a similar manner.

Matthilda 3

Continuing to remove deck hardware, my first order of the day was the main genoa tracks on each side.  These seemingly original bronze tracks were in good condition, but the fasteners were recalcitrant and hte only way to back them off was to attach numerous sets of vice grips to the nuts from underneath, then go back on deck to back out the screws with an impact driver (too aggressive and tended to shake off the vice grips) or a screw gun.  In some cases, the fasteners broke, which was just fine with me as the only goal was to remove the tracks.  With the tough access below decks, crumbling bronze nuts that were often difficult to grip with the pliers, and the backs-and-forths to the deck and interior, this chore took several hours to complete both sides.

With the tracks removed, I continued aft with the cockpit coamings, winch islands, and cleats outboard of the coamings on both sides.  While the coamings themselves were structurally sound, the solid wood winch blocks were in terrible condition on both sides–particularly to starboard, where the owner reported the winch had torn the block apart under sail one day, causing him to bodge together an interesting temporary repair to get through the season.  This was of no matter as we’d previously agreed to replace the winch blocks with nice bronze winch stands.  The port sheet winch was secured with two short screws and the two heavily corroded deck screws (basically drywall screws with a coating) seen in the first photo below.

I also removed the sliding companionway hatch and its trim to allow future access to the coachroof for needed repairs.

Next, I turned to the stern deck.  Here, there was no access to the underside for hardware removal other than to crawl through beneath the cockpit from the cabin.  While the space looked OK once past the aft cabin bulkhead, the opening there was too small for the likes of me, so the owner and I agreed that the obsolete motor well in the center of the stern deck (previously closed off from the exterior of the hull) was expendable.  Removing this well would provide good access for hardware removal now, and by incorporating it in a new access hatch later, access would be preserved and even some potential storage opened up.

Earlier, with a camera attached to a long pole, I got some images of the old outboard well and determined it was just plywood, so I didn’t expect too much difficulty removing it.

Removal turned out to be a bit more difficult than I’d expected, but once I’d made some inroads it was pretty quick to get the rest out, at least the main portion of the four sides and upper cleats.   This greatly improved access to the underside of the deck.

Now I could finish the hardware removal through the new access hatch, including the outboard bracket, aft cleats and chocks, and the mainsheet hardware.

The backstay chainplate resisted removal for the moment.  Although I was able to remove the nuts securing the bolts to the chainplate knee, the bolts themselves were so tight in their holes (probably swollen with corrosion) that I was unable to remove them, and hadn’t yet come up with a way to gain access to use some hammer force, so for now I left the chainplate in place.  Eventually I’d get it out.  Somehow.

To finish up the day, I removed the final hull cleats that had secured the outboard well, and cleaned up the worst of the debris.

The cockpit well still had a few things I had to remove next time, including the round deck hatch and the scupper screens.  But otherwise, the bulk of the deck hardware was off the boat.

Matthilda 2

Ready to start the project in earnest, I began by documenting the boat inside and out, starting with the hull.  While deck core repairs were top of the priority list for this project and the owner’s budget, we hoped to be able to restore the hull as well, though not till the deck work was well underway and I had a better idea of the time involved.

The decks were soft in most areas–sidedecks, foredeck, and coachroof, although I hadn’t done a thorough examination yet.  So repairs would likely involve all deck areas, with required cosmetic restoration to follow.  For now, I documented the existing condition and hardware locations for future reference.

Before beginning the hardware removal, I took a few moments to measure and document the existing heights of the boottop and bottom paint stem and stern, which I’d use sometime later in the project assuming that we proceeded with hull work.  I made some simple reference measurements from the transom and top of the stem as needed to give me the points I needed.  At the bow, I removed the tall bow stop on the trailer to give me access for this measurement, and added a V-stand beneath the bow for additional support since I wasn’t sure how crucial the bow stop was in stabilizing the boat.  I didn’t need to do this little job now, but it’s one I like to do early in the project so I don’t forget.

After collecting tools and such, I spent the remainder of the day removing deck hardware, starting at the stem and eventually working my way aft to the forward end of the cockpit.  I removed the bow pulpit, cleat and chock, and the cowl vent from the foredeck.  Then, I removed the chainplates–three per side–which was a time-consuming job since access was difficult because of the shape of the chainplate knees (forward lowers in particular), and it turned out all the bolts were corroded and broke during removal.  Eventually I removed all the bolts (3 in each chainplate, or 18 total) and removed the chainplates.  I’d have to clean up and inspect the bronze chainplates later to determine whether or not they needed replacement.

The four deadlights featured bronze frames inside and out, with bronze screws through the outside frame and into threaded holes in the interior frames.  Fortunately, these screws came out easily, and I determined that all the lenses were actually plastic, not glass (the owner and I had discussed this when he dropped off the boat), which would make for easy replacement.  The bronze frames were in good condition.

By the end of the day, I’d made it as far as the cockpit, including removing two small jib tracks (which were corroded at the screw locations to the extent that the tracks broke during removal), along with the handrails and various coachroof hardware.  Next time, I’d continue aft and see if I could make it all the way to the transom.

 

Matthilda 1

Shortly after her owner delivered Matthilda to the shop, I moved the boat indoors and positioned her where I wanted her for the winter.

Then, with the trailer parked, I spent several minutes leveling the boat from side to side, making minor adjustments as needed to the trailer jackstands till the boat was close to level according to my 6′ level across the bow, and across the cockpit and aft end of the coachroof.

I also adjusted the boat fore and aft, using the trailer jack, so that the waterline (defined for this purpose as the top edge of the bottom paint) was essentially the same distance above the floor at the stem and stern.  Later in the project, I planned to check and fine-tune both level measurements as needed, but for now all was close enough.

Next, I set up staging around the boat to give me a comfortable work platform for deck work, which would be the main focus of the project and the first thing I planned to start.