January 21, 2026
Building the AF4 9
Wednesday
I’m building this simple 21′ flat-bottomed skiff, designed by Jim Michalak. In Episode 9, I mill and scarf the 4 long pieces required to build the chine logs, and install them on the boat with epoxy.
Episode 9: Work between January 2-6, 2026. Project total to date: 62.25 hours