Snow Lily | Friday, March 8, 2013

With a commitment away from the shop, I had a short day on hand, but spent the time on some odds and ends, including dismantling the staging, which I no longer really needed, and I needed to make room for another boat in the shop. 

Several of the interior drawers, long refinished and awaiting installation, ended up in the way in the shop, but I felt there was no loner any reason not to install them, so I slipped the drawers into place.  The two drawer openings  in the forward cabin were a bit tight and would need some minor work to allow the drawers to fit in place, so I left those for now.


         


While out and about later in the day, I picked up the name for the transom, which I looked forward to installing soon.
 


Total Time on This Job Today:  2 hours