Snow Lily | Monday, July 30, 2012

Getting started, I washed and lightly sanded the epoxy-coated back sides of the cherry plywood panels, preparing them for installation.  Meantime, I sanded the areas on the overhead where I'd applied filler to old fastener holes and the like.


         


After cleaning up and other final preparations, I began installation of some of the new bulkhead panels, starting with the chainlocker.  I used polyurethane adhesive to secure the veneer panel to the existing bulkhead and clamps to hold it while the adhesive cured.

    

Continuing aft, I installed the two lower panels on the v-berth platform, clamping them securely in place.


With an off-site appointment during the afternoon, this wrapped up the day's work.
 


Total Time on This Job Today:  4 hours