110 Cookson Lane | Whitefield, ME 04353 | 207-232-7600 | tim@lackeysailing.com |
Snow Lily |
Monday, July 30, 2012 Getting started, I washed and lightly sanded the epoxy-coated back sides of the cherry plywood panels, preparing them for installation. Meantime, I sanded the areas on the overhead where I'd applied filler to old fastener holes and the like. |
After cleaning up and other final preparations, I began installation of some of the new bulkhead panels, starting with the chainlocker. I used polyurethane adhesive to secure the veneer panel to the existing bulkhead and clamps to hold it while the adhesive cured. |
|
Continuing aft, I installed the two lower panels on the v-berth platform, clamping them securely in place. |
|
With an off-site appointment during the afternoon, this wrapped up the day's work. |
|