Building the AF4 6

Begin Daily Project Logs

Alternately, click the button below to navigate to a specific log.

December 31, 2025

Building the AF4 6

Wednesday

In Episode 6, I take care of a couple final details required before I could begin assembly of the boat.  Specifically, I used measurements from the inside faces of the two hull panels to transfer the sheerline, or gunwale, position to the exterior of the hull, where it’d be needed for actual installation of the trim later.  Then, I epoxy-coated all sides of all the bulkheads and transom to prepare them for installation.

The work in this episode occurred between December 12-23, 2025.  Project total hours to date as of this video:  43.25

If you find this interesting, please check out the future updates and subscribe to my channel on YouTube.