Danusia Phase 2-21

Boat:

Danusia, Cape Dory 31

Schedule:

Project Schedule:  October 2024 – (Ongoing)

Project Scope:  Refinish brightwork, hull paint, other work TBD

Begin Daily Project Logs

January 30, 2025

Danusia Phase 2-21

Thursday

With the project briefly on hold till the owner arrived mid-day to collect his starting battery so he could obtain a replacement (bringing me lunch in the bargain–thanks!), I finished up the masking on the forward half of the boat, taping off the rubrail as needed and masking the bobstay and bobstay fitting.

For reference, since I’d soon be sanding off all the hull paint and trim, I took a couple measurements to help with later relocating the cove stripe, and to register the existing width of the boottop.

I continued with another round of light sanding and another coat of varnish (#5) on the working surface of the cockpit table.

Total time billed on this job today: 1.5 hours