January 17, 2025
Danusia Phase 2-12
Friday
After lightly sanding the brightwork with 320 grit, I applied the third coat of varnish to all areas.
Total time billed on this job today: 4.5 hours
Danusia, Cape Dory 31
Project Schedule: October 2024 – (Ongoing)
Project Scope: Refinish brightwork, hull paint, other work TBD
Begin Daily Project LogsAlternately, click the button below to navigate to a specific log.
Friday
After lightly sanding the brightwork with 320 grit, I applied the third coat of varnish to all areas.
Total time billed on this job today: 4.5 hours