Danusia Phase 2-7

Boat:

Danusia, Cape Dory 31

Schedule:

Project Schedule:  October 2024 – (Ongoing)

Project Scope:  Refinish brightwork, hull paint, other work TBD

Begin Daily Project Logs

January 10, 2025

Danusia Phase 2-7

Friday

With the rest of the brightwork stripped and sanded, I turned to a few loose parts I’d removed:  the pedestal table and companionway swashboards.  These also required stripping and sanding so they could be refinished.

After removing hardware, I stripped and sanded the wood clean.

Total time billed on this job today: 1.75 hours