Aquasport 2

Boat:

2000 Aquasport 175 Center Console

Schedule:

Project Complete:  11.5 total Hours

Scope of Project:   Determine waterline; prep and paint bottom; remove old striping and create new boottop; install kicker bracket

Begin Daily Project Logs

Alternately, click the button below to navigate to a specific log.

April 10, 2016

Aquasport 2

< Back to Aquasport

Sunday

Now that the bottom paint had had a chance to cure, I masked the bottom edge of the boottop, then sanded the gelcoat between the tape to prepare it for primer and paint.

After solvent-washing the newly-sanded area, I applied a coat of gray primer.

2″ below the sheerline, I installed a narrow cove stripe of light gray vinyl, which would tie in with the boottop when all was said and done.    I also removed the horrible old registration numbers from the bow so I could replace them with some nice vinyl lettering, which I’d ordered already.

Total time billed on this job today:  3 hours